All Cities / Utah / Salt Lake City
How Much Does a Building Permit Cost in Salt Lake City?
✓ Fee schedule checked against city sources
Fee math from Building Services Division, Salt Lake City, not a national average
Data last verified: July 24, 2026
Building permits are valuation-based ($115.97 + $20 per $1,000 in the $2,000-25,000 bracket). Each trade block opens with a $59 base fee plus unit fees: water heater $59 + $16 = $75, panel $59 + $40 = $99, furnace $59 + $30 = $89. A 65% plan-review fee attaches to plan-reviewed building permits. Utah levies a statutory 1% state surcharge on building permits (Utah Code 15A-1-209(5)); it is recorded here and not baked into individual rows.
Permit Cost by Project
Kitchen Remodel$749.97
Building Permit ($25K project)$575.97
Bathroom Remodel$545.97
Roof Replacement$315.97
Building Permit ($12K project)$315.97
Siding Replacement$295.97
Solar Panel Installation$264.00
Deck / Patio$235.97
Window Replacement$235.97
Building Permit ($8K project)$235.97
HVAC Replacement$113.00
Demolition$100.00
Electrical Panel$99.00
EV Charger Installation$99.00
Electrical Permit$99.00
HVAC / Mechanical Permit$89.00
Water Heater$75.00
Plumbing Permit$75.00
Fence Permit$47.00
Do You Need a Permit?
No: Paint, cosmetic updates, fixture swaps
Yes: Bathroom remodel ($545.97)
Yes: Kitchen remodel ($749.97)
Yes: Roof replacement ($315.97)
Yes: HVAC replacement ($113.00)
Yes: Water heater ($75.00)
Yes: Deck / patio ($235.97)
Yes: Window replacement ($235.97)
Yes: Electrical panel ($99.00)
Yes: Solar panels ($264.00)
Verified Permit Cost by Project Type
Kitchen Remodel
$749.97
Building, Electrical, Plumbing
Building Permit ($25K project)
$575.97
Building
Bathroom Remodel
$545.97
Building, Electrical, Plumbing, Mechanical
Roof Replacement
$315.97
Building
Building Permit ($12K project)
$315.97
Building
Siding Replacement
$295.97
Building
Solar Panel Installation
$264.00
Building, Electrical
Deck / Patio
$235.97
Building
Compare these permit costs across U.S. cities
Two Types of Permits
Salt Lake City issues building permits for structural work and separate trade permits for plumbing, electrical, HVAC, and roofing. Most remodels need both kinds. See the full breakdown of which projects need a permit and which are exempt.
Salt Lake City Permit Cost Calculator
Choose a common project or enter a project value to estimate local permit fees from Building Services Division, Salt Lake City data.
✓ Updated from local fee schedule
✓ No account needed
Source confidence
Published local schedule
Permit scope
Building permit
Method
Published fee lookup
Estimate summary
Salt Lake City calculator ready. Select a project to update the local permit estimate.
Estimated permit fee
$315.97
Updates instantly when project type or valuation changes.
✓ Verified local fee schedule
✓ Building permit by valuation at ~$12k; SLC has no flat reroof line. A 65% plan review may apply if plans are reviewed (reroofs usually have none). Add the 1% state surcharge.
Local sourceBuilt from Building Services Division, Salt Lake City fee data, not a national average.
Formula-backedValuation-based projects recalculate from the local fee formula.
Bookmark friendlyThe tool lives on this city page so citations and saved links stay stable.
A building permit in Salt Lake City runs $316 on a $12,000 project. That figure comes straight from the SLC Consolidated Fee Schedule amended June 16 2026. You pay a base building fee plus separate permits for electrical, plumbing, and mechanical work. Add the mandatory 1 percent Utah state surcharge on top. (The fee table only makes sense next to Utah Code 15A-1-209, so I read both.) Not cheap.
How Salt Lake City Calculates Permit Fees
Salt Lake City uses a valuation-based system for its building permits. The formula starts at $115.97 plus $20 per $1,000 of valuation in the $2,000 to $25,000 bracket. A $8,000 project costs you $236. Bump it to $12,000 and the fee hits $316. At $25,000 valuation you pay $576. Each trade permit opens with its own $59 base fee. An electrical panel upgrade costs $99 total. A water heater replacement runs $75. HVAC changeout sits at $89 for a furnace or $113 when you swap both furnace and AC. Plan review adds 65 percent of the building permit fee when plans get reviewed. The state tacks on another 1 percent surcharge under Utah Code 15A-1-209(5). I pulled all this from the SLC Consolidated Fee Schedule effective 2026-06-16. The calculator on this page lets you run your exact numbers without guessing. Don't assume one flat fee covers everything here. Salt Lake City keeps trades separate.
Chuck's Take
"I tell every homeowner the same thing. These separate trade permits in Salt Lake City add up quicker than you expect. A $750 kitchen permit total doesn't shock me but it sure shocks the customer when the bid comes in. Know the real number before you sign."
Leonard "Chuck" Thompson, LC Thompson Construction Co.
What Needs a Permit in Salt Lake City?
You need a permit for most home projects in Salt Lake City. Roof replacement requires one even if you stay under a certain value. The same goes for window replacement, siding jobs, and bathroom remodels. A deck needs a permit unless it stays small and low enough to qualify for exemption. Do you need a permit in Salt Lake City for a fence? Yes, it costs a flat $47. For a shed you'll probably need one too. Do I need a permit in Salt Lake City to replace a water heater? Absolutely. Same for finishing a basement or installing an EV charger. The building department doesn't play loose on enforcement. Skip the permit and you risk stop-work orders plus double or triple fees later. I checked the Salt Lake City Title 18 amendments to confirm these triggers. Better to pull it up front.
What Happens If You Skip the Permit in Salt Lake City
Work without a permit in Salt Lake City gets expensive fast. You face retroactive fees at two to four times the normal rate. That $316 roof replacement can turn into over $1,200 once penalties hit. The building department also issues stop-work orders without much warning. Fines stack on top and code enforcement doesn't hesitate. Unpermitted changes create headaches when you sell the house. Title companies flag them. Lenders pause. I studied enforcement patterns across Utah jurisdictions. Nobody wins by gambling here. Pull the permit. Pay the fee once.
How Long Is a Building Permit Good For in Salt Lake City?
A building permit in Salt Lake City stays valid for 180 days. You must start substantial work within that window or the permit expires. Extensions exist but you file for them before time runs out. The clock starts the day they issue approval. Plan your contractor schedule tightly. I noticed many homeowners lose their permit window because framing crews show up late. Don't let that happen to you.
Who Should Pull the Permit in Salt Lake City?
Your contractor pulls the permit in Salt Lake City. Not you. The rules expect the licensed person doing the work to take legal responsibility. Read your contract carefully. Make sure it states the contractor will pull all permits in their name and in a timely manner. Homeowners who pull permits themselves still need licensed trades for electrical, plumbing, and mechanical work. Red flag any contractor who asks you to pull the permit to save money. That usually means they aren't properly licensed. You carry the risk then. Let them handle the paperwork.
Chuck's Take
"Never let a contractor talk you into pulling the permit yourself. I've seen too many jobs go sideways that way. If they won't pull it in their name you need a different contractor. Period."
Leonard "Chuck" Thompson, LC Thompson Construction Co.
Utah's Statewide 1% Surcharge Hits Every Permit
Utah adds a 1 percent building permit surcharge on every project in Salt Lake City. Utah Code 15A-1-209(5) makes this mandatory across the state. The SLC fee schedule doesn't bake it into the rows so it shows up as an extra line. On a $576 building permit that means another $5.76 to the state. It doesn't sound like much until you add it to every trade permit and every project. I had to dig into the statute because the city PDF buries the reference on page 4. This surcharge funds statewide code enforcement and training. You can't avoid it. Every city in Utah collects it. The calculator on this page includes the surcharge so you see the real total before you apply.
Quick Reference · Salt Lake City Permit Requirements
| Homeowner Task | Permit? | Est. Cost |
|---|---|---|
| Paint interior / exterior | NO | Cosmetic |
| Replace flooring | NO | Cosmetic |
| Replace kitchen cabinets (same layout) | NO | Cosmetic |
| Swap a light fixture (same location) | NO | Cosmetic |
| Replace a water heater | YES | $75.00 Plumbing |
| Add / move electrical outlets | YES | $99.00 Electrical |
| Remodel a bathroom | YES | $545.97 Building, Electrical, Plumbing, Mechanical |
| Remodel a kitchen | YES | $749.97 Building, Electrical, Plumbing |
| Replace / repair roof | YES | $315.97 Building |
| Build a deck or patio | YES | $235.97 Building |
| Build a fence (≤6 ft) | YES | $47.00 Building |
| Install solar panels | YES | $264.00 Building, Electrical |
| Replace HVAC system | YES | $113.00 Mechanical |
| Replace windows (new opening) | YES | $235.97 Building |
∗ Costs are verified for Salt Lake City, UT from published fee schedule. Always confirm with your local building department.
Internal Comparison · separate trade permits
Compare Salt Lake City Permit Fees With Related Cities
Use these source-linked city pages to compare Salt Lake City against other Utah markets and cities with similar permit fee structures.
Atlanta, GAAlso uses separate trade permitsBathroom remodel permit package: $525.00 · -$20.97 vs Salt Lake City
Las Vegas, NVAlso uses separate trade permitsBathroom remodel permit package: $574.41 · +$28.44 vs Salt Lake City
Tucson, AZAlso uses separate trade permitsBathroom remodel permit package: $600.24 · +$54.27 vs Salt Lake City
Chicago, ILCross-market benchmarkBathroom remodel permit package: $602.00 · +$56.03 vs Salt Lake City
Phoenix, AZCross-market benchmarkBathroom remodel permit package: $706.00 · +$160.03 vs Salt Lake City
Dallas, TXCross-market benchmarkBathroom remodel permit package: $192.56 · -$353.41 vs Salt Lake City
Richmond, VACross-market benchmarkBathroom remodel permit package: $144.75 · -$401.22 vs Salt Lake City
Kansas City, MOCross-market benchmarkBathroom remodel permit package: $114.29 · -$431.68 vs Salt Lake City
Permit Guides
Permit Cost and Process Guides
Pricing a specific project in Salt Lake City? These guides cover what each permit runs and how the approval process actually works.
Building permit cost, every verified city ranked
How much does a building permit cost?
How long does a permit take to get?
When is a permit not required?
Deck permit cost
Roof replacement permit cost
HVAC permit cost
Kitchen remodel permit cost
Solar panel permit cost
EV charger permit cost
Do I need a permit to replace a water heater?
Do I need a permit for an electrical panel upgrade?
How to speed up a building permit
Getting an electrical permit online
What happens if you build without a permit
Before You Build
The permit is just the start. Here is real remodeling cost data on TheFatBook, built from the same source data.
Frequently Asked · Salt Lake City
How much does a building permit cost in Salt Lake City?
A typical bathroom remodel around $15,000 costs about $546 in total permits. A kitchen remodel at $25,000 valuation runs $750. Use the calculator on this page with your project value for an exact figure.
Do I need a permit to replace a water heater in Salt Lake City?
Yes you do. The plumbing trade permit costs $75. This covers the base fee plus the water heater unit charge. Your contractor should pull this before work starts.
Do I need a permit to build a deck in Salt Lake City?
Yes. A typical deck valued at $7,100 requires a building permit that costs $236. Small low decks sometimes qualify for exemption. Check the plans against Salt Lake City Title 18 rules.
Do I need a permit to replace a roof in Salt Lake City?
Yes you need a permit. A standard roof replacement valued at $12,000 costs $316. At $25,000 valuation the fee reaches $576. Salt Lake City requires permits for both replacement and repairs.
How does Utah's state surcharge affect my Salt Lake City building permit?
Utah adds a mandatory 1 percent surcharge on every building permit under Utah Code 15A-1-209(5). The city doesn't include it in the base rows so it appears as an extra charge. The calculator shows your full total including this statewide fee.
Cite This Data
APA format
Chicago format
Data Attribution